You have searched for -tamil-nadu in Awarded Tender Result. Click on any tender to view further details.

1741 PACKAGE-61 TIRUVARUR DIVISION CRIDP 2019-20
TRN : 744713 |  Trichy - Tamil Nadu
Contract Value : 5.90 Crore | Agency Name : Highway Department
Tender award for package-61 tiruvarur division cridp 2019-20
1742 TIRUVARUR DIVISION CRIDP 2019-20.
TRN : 744714 |  Trichy - Tamil Nadu
Contract Value : 5.90 Crore | Agency Name : Highway Department
Tender award for tiruvarur division cridp 2019-20.
1743 Widening, Strengthening, Improvements to Riding Quality, including Reconstruction of Culverts, including up keeping for a period of 60 months in Govt. Roads in respect of Mannargudi (H), C&M Subdivision. Road A, 01-CRIDP-19-20-M-1259-, Widening from Intermediate lane to Two lane and Strengthening of Mannargudi - Orathanadu - Thiruvonam road at km 10/8 - 12/8 (MD 248) including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-M-1260-, Widening from Intermediate lane to Two lane and Strengthening of Mannargudi - Orathanadu - Thiruvonam road at km 8/8 - 10/8 (MD 248) including upkeeping for a period of 60 months Road C,01-CRIDP-19-20-I-4440-,Improvements to Riding Quality at km 6/4 - 8/4 of Mannargudi - Thirumakkottai - Chockanavoor road (MD 840) including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-P-3664-, Strengthening of Senthangudy - Seruvamani road at km 0/0 - 3/320 including upkeeping for a period of 60 months Road E,01-CRIDP-19-20-O-2575-, Reconstruction of Box culvert at km 0/8, 2/6 of Senthangudy - Seruvamani road including Pipe culvert at Km.1/2 Road F,01-CRIDP-19-20-I-4462-, Improvements to Riding Quality at km 0/0 - 3/2 of Thulasenthirapuram - Painganadu road including upkeeping for a period of 60 months.
1744 Strengthening, Reconstruction of Box culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Thiruvarur (H), C&M Subdivision Road A 01-CRIDP-19-20-S-0313 Strengthening of Nagapattinam - Gudalore - Mysore Road (Old abandoned NH:67) - Tiruvarur Town Limit(SHU89) at Km. 24/050 - 24/650 including upkeeping for a period of 60 months Road B 01-CRIDP-19-20-O-2547 Strenghthening of Kangalanchery - Vadakandam Road at Km. 0/0-2/0 including upkeeping for a period of 60 months Road C 01-CRIDP-19-20-O-2548 Strenghthening of Kangalanchery - Vadakandam Road at Km.2/0-4/0 including upkeeping for a period of 60 months Road D 01-CRIDP-19-20-O-2549 Strenghthening of Kangalanchery - Vadakandam Road at Km.4/0-6/0 including upkeeping for a period of 60 months Road E 01-CRIDP-19-20-O-2550 Strenghthening of Kangalanchery - Vadakandam Road at Km. 6/0-7/2 including upkeeping for a period of 60 months Road F 01-CRIDP-19-20-O-2578 Construction of Retaining Wall at Km.0/4 of Kangalanchery -Vadakandam Road Road G 01-CRIDP-19-20-O-2576 Reconstruction of Box Culvert at Km.4/6, 6/2 of Mangudi - Kamalapuram - Koradachery Road.
1745 Widening and Improvements, Strengthning, Improvements to Riding Quality, Reconstruction of culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Keeranur (H), C&M Subdivision. Road A-01-CRIDP-19-20-S-0289-Strengthening of Thiruchirapalli - Ramanathapuram Road (Abandoned NH 210 Stretches) URBAN Stretches in keeranur at Km 27/2-28/6 including construction of retaining wall at km 28/2 (SH) including upkeeping for a period of 60 months Road B-01-CRIDP-19-20-I-4336- Improvements to Riding Quality at km 3/0-8/0 of Kunnandarkoil-Sengipatti road (MD 833) including upkeeping for a period of 60 months Road C-01-CRIDP-19-20-P-3641- Widening from Single Lane to Intermediate Lane and Improvements of Kulathur-Pakudy road at km 1/0-1/6 and 3/6-5/0,including reconstruction of culvert at km 4/8 (using plastic waste) including upkeeping for a period of 60 months Road D-01-CRIDP-19-20-I-4348- Improvements to Riding Quality at km 0/0-4/8 of Trichy-Madurai(Via)Melur road to Meenaveli road including upkeeping for a period of 60 months.
1746 Strengthening, Improvements and Improvements to Riding Quality, Reconstruction of Culverts including up keeping for a period of 60 months in Govt. Roads in respect of Thirumayam (H), C&M Subdivision. Road A, 01-CRIDP-19-20-S-0285, Strengthening of Thanjavur - Pattukkottai - Aranthangi - Karaikudi - Kallal - Kalayarkovil - Maravamangalam - Ellangudi - Paramakudi - Muthukulathur - Sayalkudi road At km 110/6-111/6 (SH 29) including Upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-I-4344, Improvements to Riding Qulaity at km 17/8-18/8,19/6-21/0,21/6-24/6 and 25/0-25/6 of Pudukkottai-Embal road (MD663) including Upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-O-2377, Improvements of Sivapuram - Neivasalpatti road at Km 2/0-6/0 including Re-construction of culvert at Km 2/2 including Upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-O-2353, Improvement of km 1/2 of Arimalam - Thirumayam road to Pudupatti - Nedungudi road (via) Melnilaipatti road at km 11/0-14/4 including Re-construction of culverts at km 11/2,11/10,12/4,13/2,13/6 and 13/8 including Upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-I-4367, Improvements to Riding Quality at km 22/0-24/0 of Panyapatti - Rangiyem Road including Upkeeping for a period of 60 months.
1747 purchase of Vacuum pump with filter assembly
TRN : 712796 |  Coimbatore - Tamil Nadu
Contract Value : 1.63 Lacs | Agency Name : Indian Council Of Agricultural Research
Tender award for purchase of vacuum pump with filter assembly
1748 purchase of TDR - Time Domain Refractometer
TRN : 712798 |  Coimbatore - Tamil Nadu
Contract Value : 1.10 Lacs | Agency Name : Indian Council Of Agricultural Research
Tender award for purchase of tdr - time domain refractometer
1749 Provision of GI sheet roofing including part office space over the old portion of the Departure Terminal Building at Coimbatore International Airport. Electrical Works.
1750 Design, Supply, Installation, Testing and Commissioning of SCADA,RTUs and Leak Detection System(LDS) for CTMPL along with integration of SCADA System with PLC based control and RTUs including comprehensive AMC of the complete system for five years. PART-II: Design, Supply, Installation, Testing & Commissioning of SCADA system clients and RTU for Chennai ATF Pipeline, integration of SCADA and LDS supplied under Group B Part I with Chennai ATF Pipeline facilities. "

Get Tamil Nadu Awarded Tender Alert...

127159

Advertisment
Advertisment