1904REPAIRS TO ROOF FLOORING PLINTH PROTECTION JOINERY PLASTERING CHAJJA PLUMBING WORK AND REPAIR TO SOIL WASTE PIPES AT MD AND OTM ACCN IN ZONE A AREA
TRN :
706836
|
Chennai - Tamil Nadu
Contract Value :
31.18 Lacs |Agency Name :
Military Engineer Services
1906Digital Media services such as Reconstruction of Website, Uploading of Videos and Photos on Social Media, Weekly News,Awareness Activities,Daily Morning and Evening Linking of Social Media Accounts,Vanity URL and all other related events/works,etc.
TRN :
706982
|
Chennai - Tamil Nadu
Contract Value :
35.04 Lacs |Agency Name :
Chennai Metro Rail Limited
1907Special Repairs to Government Highways Roads in Kothagiri (H), C&M Sub Division Jurisdiction – Package No. 81
A) Special Repairs to Km 24/4-24/6, 26/6-26/8 and 28/4-29/0 of Ooty Kotagiri Mettupalayam Sathi Gobi Erode road
B) Special Repairs to Km 2/0-2/6 of Kengarai Road
TRN :
717411
|
Coimbatore - Tamil Nadu
Contract Value :
56.31 Lacs |Agency Name :
Highway Department
1908Widening, Strengthening, Improvements, including Reconstruction of culvert, Construction of Retaining wall, including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur (H), C&M Subdivision.
Road A, 01-CRIDP-19-20-O-2386-,Widening from Single lane to Intermediate lane and Strengthening of Medicalcollege - Manojipatti road at km 0/0 - 1/6 including reconstruction of culvert at KM 0/2 and 1/2 including upkeeping for a period of 60 months
Road B, 01-CRIDP-19-20-O-2433-, Improvements of Grand anaicut canal bank road at km 2/8 - 4/0 including construction of Retaining wall at Km 3/10 including upkeeping for a period of 60 months
Road C,01-CRIDP-19-20-O-2434-, Improvements of Grand anaicut canal bank road at km 4/0 - 5/4 including construction of Retaining wall at Km 4/10 including upkeeping for a period of 60 months
Road D, 01-CRIDP-19-20-O-2450-, Reconstruction of Box culvert at km 1/10 of Marudakudi road including upkeeping for a period of 60 months
TRN :
717401
|
Trichy - Tamil Nadu
Contract Value :
5.20 Crore |Agency Name :
Highway Department
1909Strengthening/Improvements, Construction of Culvert, Drain and Retaining Wall works in Polur (H) C&M Sub Division Jurisdiction
A) Strengthening to N.C.Veeralore road KM 0/0 - 3/0 including Upkeeping for a period of 60 months (01-CRIDP-19-20-M-1012)
B) Strengthening to N.C.Veeralore road KM 3/0 - 5/0 including Upkeeping for a period of 60 months (01-CRIDP-19-20-M-1013)
C) Strengthening to N.C.Veeralore road KM 5/0 - 7/0 including Upkeeping for a period of 60 months (01-CRIDP-19-20-M-1020)
D) Improvements to Riding surface at Km 0/0 - 4/2 of Cuddalore Chittoor road to Pathiyavadi including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3992)
E) Construction of Drain in Km 11/2-12/2 of N.C.Veeralore Road (01-CRIDP-19-20-M-1021)
F) Construction of Retaining wall at Km 4/0-4/4 of Polur – Chengam Road to N.C. Veeralore Road (via) Sengaputheri (01-CRIDP-19-20-O-2095)
G) Reconstruction of Culvert at Km 0/2, 0/8, 2/8, 3/8 of Cuddalore Chittoor road to Pathiyavadi (01-CRIDP-19-20-O-2077)
H) Reconstruction of Box Culvert at Km 4/2 (i) of Polur Chengam road to N.C.Veeralore road (via) Sengaputheri (01-CRIDP-19-20-O-2081).
TRN :
743008
|
Chennai - Tamil Nadu
Contract Value :
6.76 Crore |Agency Name :
Highway Department
1910Improvement Works, Construction of Culvert and Retaining Wall Works including upkeeping in Chengam (H) C&M Sub Division Jurisdiction
A) Improvements of Chengam - Kuppanatham road at Km 1/2 - 3/0 including Upkeeping for a period of 60 months (01-CRIDP-19- 20-P-3586)
B) Improvements of Chengam - Kuppanatham road at Km 3/0 - 5/0 including Upkeeping for a period of 60 months (01-CRIDP-19- 20-P-3587)
C) Improvements to Riding quality at Km 0/0 - 2/6 of Pondy - Krishnagiri road to Paliyapattu road including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3969 ) D) Improvements to Riding quality at Km 0/0 - 4/8 of Kayampattu Theethandapattu H/C road (via) Valayampattu including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3994) E) Improvements to Riding quality at Km 0/0 - 1/6 & 0/0 - 1/4 of Polur Chengam road to Pudur Chengam road, joint Ammapalayam - Pudupalayam road (Road A) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3995) F) Construction of Retaining wall at Km 0/0 - 0/4 of Polur - Chengam road to Kolanthangal road ( 01-CRIDP-19-20-O-2093) G) Construction of Retaining wall at Km 3/2 & 4/2 - 5/0 of Polur - Chengam road to Pondy Krishnagiri road (via) Chennasamudiram (01-CRIDP-19-20-O-2094) H) Reconstruction of RCC Slab Culvert at Km 140/8 of Pondy Krishnagiri Road (NH 66 Abandoned Stretch) (SH) (01-CRIDP-19-20-S-0169) I) Reconstruction of Pipe Culvert at Km 5/10 of Chengam - Kuppanatham road (01-CRIDP-19-20-O-2063) J) Reconstruction of RCC Slab Culvert at Km 0/2, 1/2, 1/4, 0/2(i) (ii), 0/8, 0/10 of Polur - Chengam road to Pudur - Chengam road joint Ammapalayam Pudupalayam road (Road A) (01-CRIDP-19-20-O-2079) K) Reconstruction of RCC Slab Culvert at Km 0/4, 0/10, 2/6(i), (ii) of Kayampattu Theethandapattu H/C road (via) Valayampattu (01-CRIDP-19-20-O-2085).
TRN :
743005
|
Chennai - Tamil Nadu
Contract Value :
7.06 Crore |Agency Name :
Highway Department