2413Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Box Culverts, Retaining Wall, and Providing Revetment, Well Protective Wall, Drain and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-21)
The Following works are involved in this package
1.Improvements of Sankari - Mecheri road (via) Edappady at km 16/2 - 16/8 (SH 220) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0374)
2.Improvements to Riding Quality at km 13/8 - 14/6 and 15/4 - 15/6 of Sankari - Mecheri road(via) Edappady (SH 220) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I- 4520)
3.Construction of Drain at km 13/8 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-S- 0388)
4.Construction of Box culvert at km 17/10 of Magudanchavadi - Komarapalayam road (via)Edappady (SH 221) including Upkeeping for a period of 60 months(01-CRIDP-19-20-S- 0385)
5.Widening from Intermediate lane to Two lane and Improvements of Edappady - Nedungulam - Koneripatty-Anandampalayam road at km 8/4 - 9/8 (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0360)
6.Improvements of Sankari - Mecheri road (via) Edappady at km 23/2 - 24/2 including widening of curve and providing well protective wall including Upkeeping for a period of 60 months(SH 220) (01-CRIDP-19-20-S- 0376)
7.Providing revetment at km 4/4 of Edappady - Nedungulam-Koneripatty-Anandampalayam road (for high embankment portion) (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0390)
8.Construction of Retaining wall at km 8/10,9/2,9/4,9/6 and 9/8 of Edappady -Nedungulam - Koneripatty-Anandampalayam road including Box culvert at Km 8/8,8/10 and 9/2 (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0394)
9.Improvements to Riding Quality at km 32/2 - 33/0 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-I-4528) including Upkeeping for a period of 60 months
10.Construction of Drain at km 18/2 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-S- 0396)
11.Raising the dip at km 2/8 of Moolapathai - Irupali road (via) Chittur including Construction of Box culvert. including Upkeeping for a period of 60 months(01-CRIDP-19-20-O-2628)
12.Construction of Drain at km 0/6-1/2 of Koneripatti - Poolampatti Road (via) Thambagoundanoor Road Karattupudur Road (01-CRIDP-19-20-O-2638)"
TRN :
701089
|
Salem - Tamil Nadu
Contract Value :
6.07 Crore |Agency Name :
National Highway Division
2414Widening and Improvements, Improvements to Riding Quality, Providing Centre Median and including Up Keeping for a period of 60 Months on Government Roads in Palladam (Highways), C&M, Sub Division. Package No.45
A) Widening from Two lane to Four lane and Improvements of Palladam - Cochin Frontier road at Km 0/0 - 0/500 (SH 163) including upkeeping for a period of 60 months
B) Widening from Two lane to Four lane and Improvements of Palladam - Cochin Frontier road at Km 0/500 - 1/0 including upkeeping for a period of 60 months
C) Providing Center Median at km 0/0 - 1/0 of Palladam - Cochin Frontier road (SH 163)
D) Widening from Two lane to Three lane and Improvements of Palladam - Cochin Frontier road at Km 1/0 - 2/0 (SH 163) including upkeeping for a period of 60 months
E) Improvements to Riding Quality at Km 0/0 - 2/6 of Sedapalayam- Arumuthampalayam road including upkeeping for a period of 60 months
F) Improvements to Riding Quality at Km 0/0 - 2/0 of Kombakattuputhur- Sengathurai road (Via) Devarayampalayam including upkeeping for a period of 60 months"
TRN :
676835
|
Tirupur - Tamil Nadu
Contract Value :
5.94 Crore |Agency Name :
Highway Department
2415Widening and Improvements, Improvements, Rebuilding, Improvements to Riding Quality, Reconstruction of Box Culverts. Providing Centre Median Construction of Drain and including Up Keeping for a period of 60 Months on Government Roads in Palladam (Highways), C&M, Sub-Divison. Package No.43
A) Improvements of Kamanaickenpalayam - Annur road at km 10/2 - 12/8 (SH 165) including upkeeping for a period of 60 months
B) Rebuilding of Kamanaickenpalayam - Annur road at Km 12/8 - 13/2 including Reconstruction of Box Culvert in lieu of existing damaged Culvert at Km 12/10 & 13/2 and Construction of Drain at Km 12/10 & 13/2 and Providing Center median at Km 13/2 (SH 165) including upkeeping for a period of 60 months
C) Widening from Single Lane to Intermediate Lane and Improvements of Palladam - Dharapuram Road at Km 8/8 of Kamanaickenpalayam - Annaur road at Km 3/4- 4/0 and 4/4 - 6/0 including upkeeping for a period of 60 months
D) Improvements to Riding Quality at Km 6/0 - 8/0 and 8/4 - 10/8 of Palladam - Dharapuram road at Km 8/8 of Kamanaickenpalayam - Annaur road including upkeeping for a period of 60 months
E) Reconstruction of Box culvert Single cell of size 3m x 2m at km 10/8 of Palladam - Dharapuram road at Km 8/8 of Kamanaickenpalayam - Annaur road
F) Improvements to Riding Quality at Km 0/0 - 3/2 of Kamanaickenpalayam Annur Road to Kodangipalayam road (via) Perumagoundenputhur including upkeeping for a period of 60 months"
TRN :
676840
|
Tirupur - Tamil Nadu
Contract Value :
6.14 Crore |Agency Name :
Highway Department
2416Providing Cantilever Gantry board, Over Head Gantry board and Metal Crash Barrier in Govt. Roads in respect of Trichy (H), C&M Division.
Road A-01-CRIDP-19-20-M-1191 Providing Metal crash barrier at km 8/4,8/6,9/4,10/6, 10/8, 11/2, 11/4, 11/6,11/10 & 12/4 of Siruthaiyur - Sengaraiyur Road (Via) Anbil (MD 1125)
Road B-01-CRIDP-19-20-S-0273 Providing Metal crash barrier at km 33/4 of Musiri - Thuraiyur - Athur road (SH 30)
Road C-01-CRIDP-19-20-O-2328 Providing Metal crash barrier at km 3/4-4/2 of Keerambur - Vengadathanur - Renganathapuram Road
Road D-01-CRIDP-19-20-O-2330 Providing Metal crash barrier at km 1/6, 1/10, 3/2, 3/4 of Govinthapuram - Renganathapuram road
Road E-01-CRIDP-19-20-O-2334 Providing Metal crash barrier at km 3/2, 3/4, 3/8, 3/10 of GST Road Branching at km 290/6 Uttathur (Via) Neikulam Road
Road F-01-CRIDP-19-20-M-1202 Providing Metal crash barrier at km 7/4 & 7/6 of Seeplaputhur - Kattuputhur - Namakkal road
Road G-01-CRIDP-19-20-O-2333 Providing Metal crash barrier at km 5/2, 5/4, 11/2, 11/4, 11/8, 11/10, 12/2 & 12/4 of Nedungur - Neikulam - Peruvalapur Road
Road H-01-CRIDP-19-20-S-0271 Providing and fixing Cantilever Gantry board at Km 17/6, 19/4, 32/6 of Musiri - Thuraiyur - Athur road (SH 30) including Road Furniture.
Road I-01-CRIDP-19-20-S-0272 Providing and fixing Cantilever Gantry board at Km 27/4 of Trichy - Thuraiyur road (SH 62) including Road Furniture.
Road J-01-CRIDP-19-20-S-0278 Providing of Cantilever Gantry board at km 3/2, 3/6, 10/4 of Trichy -Thuraiyur Road (SH62) including Road Furniture.
Road K-01-CRIDP-19-20-M-1209 Providing Cantilever Gantry board at km 0/2, 4/10 of Pullambady -Sirugalappur -Padalur Road (MD380) including Road Furniture.
Road L-01-CRIDP-19-20-M-1026 Providing Cantilever Gantry board at km 23/6 of Pullambady -Sirugalappur -Padalur Road (MD380) including Road Furniture.
Road M-01-CRIDP-19-20-M-1208 Providing Cantilever Gantry board at km 0/2, 9/8 of Mandapam - Peruvalappur (via) Kumulur - Kannakudy Road (MD1126) including Road Furniture.
Road N-01-CRIDP-19-20-M-1210 Providing Cantilever Gantry board at km 6/8, 6/10 of Poovalur -Siruganur -Thiruppattur Road (MD371) including Road Furniture.
Road O-01-CRIDP-19-20-M-1204 Providing Cantilever Gantry board at km 14/4, 14/6, 25/6 of Poovalur -Siruganur -Thiruppattur Road (MD371) including Road Furniture.
Road P-01-CRIDP-19-20-M-1192 Providing Cantilever gantry board at km 33/8, 33/10 of Keelapalur-Pullambady (Via) Thirumalappady Road (MD608) including Road Furniture.
Road Q-01-CRIDP-19-20-M-1205 Providing Cantilever Gantry board at km 4/2 of Samayapuram - Keelakannukulam Road (Via)Manachanallur -Thiruppanjali Road (MD823) including Road Furniture.
Road R-01-CRIDP-19-20-O-2339 Providing Cantilever Gantry board at km 8/2 of Irungalur - Sengenthi Road including Road Furniture.
Road S-01-CRIDP-19-20-O-2338 Providing Cantilever Gantry board at km 0/2, 9/8 of Pullambady - Viduthalaipuram Road (via) Vanthalai, Gudalur, Kanakiliyanallur including Road Furniture.
Road T-01-CRIDP-19-20-O-2337 Providing Cantilever Gantry board at km 0/2, 3/2 of GST Road branching at km 290/6 to Thirupattur Road including Road Furniture.
Road U-01-CRIDP-19-20-M-1200 Providing and Fixing Cantilever Gantry board at km 1/2 & 19/6 of Musiri - T.Pet - Murugur - Eragudy Road (MD-277) Including road Furniture.
Road V-01-CRIDP-19-20-S-0268 Providing and fixing Over Head Gantry board at Km 26/8 of Musiri - Thuraiyur - Athur road (SH 30) including Road Furniture.
Road W-01-CRIDP-19-20-S-0269 Providing and fixing Over Head Gantry board at Km 0/2 of Thuraiyur Byepass road (SH U 170) including Road Furniture.
Road X-01-CRIDP-19-20-S-0270 Providing and fixing Over Head Gantry board at Km 2/4 of Thuraiyur - Perambalur road (SH 142) including Road Furniture.
Road Y-01-CRIDP-19-20-O-0277 Providing and fixing Over Head Gantry board at Km 0/2 of Musiri - Thuraiyur - Athur road including Road Furniture.
Road AA-01-CRIDP-19-20-M-1199 Providing and fixing Over Head Gantry board at Km 0/8(i), (ii), 2/8 of Musiri byepass road (MD 1004) including Road Furniture.
Road AB-01-CRIDP-19-20-M-1201 Providing and fixing Over Head Gantry board at Km 13/8 of Thottiyam - Kattuputhur road(MD 487) including Road Furniture.
"
TRN :
727833
|
Trichy - Tamil Nadu
Contract Value :
3.75 Crore |Agency Name :
Highway Department
2417Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of CD works, Protective wall and Up keeping for a period of 60 months in Omalur and Mettur (H) C&M Sub Division (Package-33)
The Following works are involved in this package
1) Widening from Single lane to Intermediate lane and Improvements of Raman Nagar Koonandiyur road at Km.2/0-3/0 including Dip Raising at Km.2/2, Reconstruction of Box Culvert and Slab Culvert at Km.2/2(i),(ii) and Construction of Well Protective Wall at Km.2/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2621)
2) Improvements of Sankari - Mecheri road (via) Edappady at km 41/400- 44/610 (SH- 220) including CD works including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0379)
3) Widening from Single lane to Intermediate lane and Improvements of Periyasoragai – Vanavasi road Km.0/0-3/0 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2614)
4) Improvements to Riding Quality at km 0/0 - 7/2 of Parakallur- Koilur road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4551)"
TRN :
719202
|
Salem - Tamil Nadu
Contract Value :
5.96 Crore |Agency Name :
Highway Department
2418Improvements to Roads and Improvements to Riding Quality to Government Roads including Consruction, Reconstruction of Box Culverts, Construction of Retaining Wall in Salem (H) C &M,Sub Division (Package-4)
The Following works are involved in this package
1. Improvements of Mallur - Mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2589) 2. Reconstruction of Box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of Mallur - Mookuthipalayam road and Construction of Drain at Km 0/2,0/4,0/6. 3. Improvements of Mallur - Mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2606) 4. Improvements to Riding Quality at km 1/0 - 3/609 of Poolavari - Parapatty road including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2590) 5. Improvements to Riding Quality at km 0/0 - 1/2 of Jari Kondalampatty Paranattamangalam road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4509) 6. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 0/0 - 1/0 (MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1295) 7. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 1/0 - 3/4 including Construction of culvert at km 2/10, 3/2 and Construction of Retaining wall at Km 1/10(MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1296) 8. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 3/4 - 5/0 including Construction of retaining wall at Km 2/2, 4/6, 4/10 and curve improvements at Km 4/8,4/10(MD 594) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1304) "
TRN :
719186
|
Salem - Tamil Nadu
Contract Value :
7.48 Crore |Agency Name :
Highway Department
2419Improvements to Government Roads including Construction of culverts and Retaining wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-31)
The Following works are involved in this package
1) Improvements of Sankari - Mecheri road (via) Edappady at km 36/2- 38/2 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0383
2) Improvements of Sankari - Mecheri road (via) Edappady at km 38/2-40/2 and 41/2- 41/4 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0384
3) Improvements of Tharamangalam - Jalagandapuram Road at km 5/0 - 6/0 including Construction of Retaining wall at km.2/4 - 3/0 (SH 219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0378
4) Improvements to Riding Quality at km 6/0 - 7/0 of Tharamangalam Jalagandapuram road (SH-219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4527
5) Improvements to the Riding Quality at km 9/0 - 11/4 of Tharamangalam - Nangavalli - Kunjandiyur road(SH-223) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4531
6) Construction of Retaining wall at km. 9/4- 9/6 of Tharamangalam - Nangavalli- Kunjandiyur Road including CD works (SH-223) 01-CRIDP-19-20-S-0406 7) Construction of Retaining Wall at km.0/8,1/2,1/6and 1/8 of Tholasampatty -Mallapanur road including Reconstruction of Box Culvert at km 1/8 ( MD 1174A) 01-CRIDP-19-20-M-1325"
TRN :
719193
|
Salem - Tamil Nadu
Contract Value :
5.77 Crore |Agency Name :
Highway Department
2420Widening and Improvements to Riding Quality to Government Roads including Construction of CD works, Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-29)
The Following works are involved in this package
1) Improvements to the Riding Quality at km. 3/6- 5/0 of Tharamangalam - Nangavalli- Kunjandiyur Road (SH-223) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4525)
2) Construction of Drain at km 1/2- 1/8 (both sides) of Tharamangalam - Nangavalli- Kunjandiyur Road including Well protective wall at km.1/2 and CD works (SH-223) (01-CRIDP-19-20-S-0391) 3) Construction of Retaining wall at km 14/8- 15/0 of Jagir Ammapalayam-Tharamangalam Road (SH-219) (01-CRIDP-19-20-S-0397)
4) Construction of Drain at km. 1/8- 2/2 of Karuppur-Vellapatty-Thathiyangarpatty road (MD 1175) (01-CRIDP-19-20-M-1323)
5) Improvements of Omalur-Muthunaickenpatty- Alagusamuthiram road at Km 2/6-7/2 including Construction of Storm water Drain at km 7/8- 8/2 and Construction of Retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2624)
6) Construction of Drain at km. 1/2-1/8 of Thekkampatty – Moongilpaddy road (01-CRIDP-19-20-0-2635)
7) Improvements to the Riding Quality at Km 4/0- 6/4 Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4539)
8) Construction of Drain at km. 0/2- 1/2 of Puliyampatty-Karuppur road including CD works (01-CRIDP-19-20-O-2637)
9) Improvements to Riding Quality at km 0/0-4/2 of Km 7/0 of omalur– sankari- Thiruchengode- Paramathi road to Muthunaikenpatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4549)
10) Construction of Drain at km 8/4- 8/8 (both sides) of Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including Construction of Box culvert at km. 8/8 01-CRIDP-19-20-O-2632"
TRN :
719194
|
Salem - Tamil Nadu
Contract Value :
6.31 Crore |Agency Name :
Highway Department