2461 Improvements to Riding Quality and Including Upkeeping for a Peroid of 60 Months on Government Roads in Karur (Highways), C&M, Sub Division. Package No.16 A) Improvements to Riding Quality at km 217/2 - 218/0 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months B) Improvements to Riding Quality at km 216/0 - 217/2 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months C) Improvements to Riding Quality at km 214/8 - 216/0 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months D) Improvements to Riding Quality at km 213/4 - 214/8 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months E) Improvements to Riding Quality at km 283/2 - 285/0 of Varanasi - Kanyakumari Road (Abandoned portion of NH7 at Thottakurichi and Karur) (SH 41) including upkeeping for a period of 60 months F) Improvements to Riding Quality at km 0/0 - 0/6 of New Amaravathi road including upkeeping for a period of 60 months"
2462 Widening and Improvements, Improvements to Riding Quality, Widening of Culverts, Construction of Retaining Wall and Including Upkeeping for Period of 60 Months on Government Roads in Karur (Highways), C&M, Sub Division. Package No.21 A) Improvements to Riding Quality at km 2/4 - 4/6 of Karur - Esanatham - Koombur - Viriyampatty Road (MD 606) including upkeeping for a period of 60 months B) Improvements to Riding Quality at km 6/0 - 9/4 of Nerur - Thalavapalayam CC road including upkeeping for a period of 60 months C) Improvements to Riding Quality at km 4/4 - 6/8 of Somur - Achamapuram (via) Thirumukkudalur road including upkeeping for a period of 60 months D) Widening from Single lane to Intermediate lane and Improvements of Nagai - Gudalur - Mysore road to Km 221/6 to branching Andankoil Agraharam road (Road - A) at km 0/0 - 2/300 Including Widening of Culvert and Construction of Retaining Wall including upkeeping for a period of 60 months E) Widening from Single lane to Intermediate lane and Improvements of Km 9/0 of Paramathy - Noyyal road to Athipalayam road at km 0/0 - 2/0 including upkeeping for a period of 60 months F) Widening from Single lane to Intermediate lane and Improvements of Km 9/0 of Paramathy - Noyyal road to Athipalayam road at km 2/0 - 2/8 and 3/0 - 4/4 including upkeeping for a period of 60 months G) Improvements to Riding Quality at km 6/0 - 8/6 of Punnam - Pugalur Road (MD 668) including upkeeping for a period of 60 months H) Improvements to Riding Quality at km 0/0 - 2/2 and 3/8 - 4/6 of Punnam - Pugalur Road (MD 668) including upkeeping for a period of 60 months
TRN : 719165 |  Tirupur - Tamil Nadu
Contract Value : 7.25 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, widening of culverts, construction of retaining wall and including upkeeping for period of 60 months on government roads in karur (highways), c&m, sub division. package no.21 a) improvements to riding quality at km 2/4 - 4/6 of karur - esanatham - koombur - viriyampatty road (md 606) including upkeeping for a period of 60 months b) improvements to riding quality at km 6/0 - 9/4 of nerur - thalavapalayam cc road including upkeeping for a period of 60 months c) improvements to riding quality at km 4/4 - 6/8 of somur - achamapuram (via) thirumukkudalur road including upkeeping for a period of 60 months d) widening from single lane to intermediate lane and improvements of nagai - gudalur - mysore road to km 221/6 to branching andankoil agraharam road (road - a) at km 0/0 - 2/300 including widening of culvert and construction of retaining wall including upkeeping for a period of 60 months e) widening from single lane to intermediate lane and improvements of km 9/0 of paramathy - noyyal road to athipalayam road at km 0/0 - 2/0 including upkeeping for a period of 60 months f) widening from single lane to intermediate lane and improvements of km 9/0 of paramathy - noyyal road to athipalayam road at km 2/0 - 2/8 and 3/0 - 4/4 including upkeeping for a period of 60 months g) improvements to riding quality at km 6/0 - 8/6 of punnam - pugalur road (md 668) including upkeeping for a period of 60 months h) improvements to riding quality at km 0/0 - 2/2 and 3/8 - 4/6 of punnam - pugalur road (md 668) including upkeeping for a period of 60 months
2463 Improvements, Improvements to Riding Quality, Construction of Retaining Walls and Including Upkeeping for Period of 60 Months on Government Roads in Krishnarayapuram (Highways), C&M, Sub Division. Package No.26 Road A:- Improvements of Thogamalai - Mylmpatty road at Km.6/0-7/6 (MD 482) including upkeeping for a period of 60 months. Road B:- Improvements of Manapparai – Gujiliamparai Road Km.18/450-22/0 (MD 628) including upkeeping for a period of 60 months. Road C:- Improvements of Manapparai – Gujiliamparai Road Km.22/0-25/0 (MD 628) including upkeeping for a period of 60 months. Road D:- Improvements to Riding Quality at Km.4/0-6/4 of Mylampatty – Palayam Road (MD 280) including upkeeping for a period of 60 months. Road E:- Improvements of Manapparai - Gujiliamparai road Km.15/4-17/0 (MD 628) including upkeeping for a period of 60 months. Road F:- Improvements to Riding Quality at Km.0/0-5/2 of Veeranampatty – Nalluranpatty Road including upkeeping for a period of 60 months. Road G:- Construction of retaining wall at Km.0/8, 2/2, 3/2 & 3/4 of Servaikaranpatty - Thanivasal Road.
2464 Widening and Improvements, Improvements, Improvements to Riding Quality, Widening of Culverts, Construction of Retaining Walls and Including Upkeeping for Period of 60 Months on Government Roads in Krishnarayapuram (Highways), C&M, Sub Division. Package No.25 Road A:- Widening from Two lane to Three lane and Improvements of Vaiyampatty - Karur road (via) Mylampatty - Uppidamangalam at Km 11/900-13/0 including widening of culvert at Km 12/2,12/4 & 12/6 (SH 199) including upkeeping for a period of 60 months. Road B:- Improvement of Musiri - Kulithalai - Pudukottai - Alangudi - Peravoorani - Sethubhavachatram Road at Km.23/0-25/0 (SH 71) including upkeeping for a period of 60 months. Road C:- Improvement of Musiri - Kulithalai - Pudukottai - Alangudi - Peravoorani - Sethubhavachatram Road at Km.25/0-26/0 (SH 71) including upkeeping for a period of 60 months. Road D:- Improvements to Riding Quality at Km.9/0-12/4 of Palaviduthi - Kadavur - Ayyalur road (MD 648 ) including upkeeping for a period of 60 months. Road E:- Construction of retaining wall at Km.19/2, 19/4, 19/6, 19/8, 19/10, 20/2, 20/6, 20/10, 22/8, 27/10, 28/2 & 29/6 of Manapparai - Gujiliyamparai road (MD 628) Road F:- Improvements to Riding Quality at Km.0/0-2/0 of Veeranampatty – Viralipatty road including upkeeping for a period of 60 months
2465 REPAIR AND MAINTENANCE OF EXTERNAL ELECTRIFICATION WORKS AND LT PANEL BOARD AT INS AGRANI
TRN : 729511 |  Coimbatore - Tamil Nadu
Contract Value : 8.55 Lacs | Agency Name : Military Engineer Services
Tender award for repair and maintenance of external electrification works and lt panel board at ins agrani
2466 Providing Paver Block end to end and Construction of Storm Water Drain cum Footpath from Km 0/0 – 1/0 of Valasaravakkam – Ramapuram Road (via) Valluvar Nagar (MD1020)
2467 Widening, Improvements, Dip raising, Curve Improvements, Improvements to Riding Quality to Government Roads including Construction and Reconstruction of Culvert, Retaining wall, Box culvert, Drain and up keeping the roads for a period of 60 months in Dharmapuri (H) C&M Sub Division (Package 55) The Following works are involved in this package 1) Improvements to Riding Quality at Km.142/6-143/740 of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4597) 2) Improvements to Riding Quality at Km.141/6-142/6 of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4598) 3) Improvements of Bommidi R.S. - Thoppaiyar road at Km.18/2-19/4 and 20/0-20/6 and including dip raising at Km.18/4, 18/6, 18/8, 20/4 and Construction of Culvert at 18/4, 18/6, 20/4 and Reconstruction of culvert at Km.18/8 (MD-860) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1372) 4) Improvements of Bommidi R.S. - Thoppaiyar road at Km.21/0-22/4, including dip raising at Km.21/4, 21/8, 21/10 & 22/2, Construction of Culvert at Km.22/2 and Reconstruction of culvert at Km.21/4(i),(ii), 21/6(i),(ii), Construction of Retaining Wall and Curve improvements at Km.21/2 & 21/4 (MD-860) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1373) 5) Widening from End to End and Improvements of Dharmapuri Bus Stand Approach road at Km.0/4-0/745 including Construction of Box Culvert at Km.0/8 and Construction of Drain at Km.0/4-0/745 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2692) "
TRN : 718801 |  Salem - Tamil Nadu
Contract Value : 6.51 Crore | Agency Name : Highway Department
Tender award for widening, improvements, dip raising, curve improvements, improvements to riding quality to government roads including construction and reconstruction of culvert, retaining wall, box culvert, drain and up keeping the roads for a period of 60 months in dharmapuri (h) c&m sub division (package 55) the following works are involved in this package 1) improvements to riding quality at km.142/6-143/740 of varanasi - kanyakumari road (abandoned nh-7) dharmapuri town limit (sh-129) including upkeeping for a period of 60 months (01-cridp-19-20-i-4597) 2) improvements to riding quality at km.141/6-142/6 of varanasi - kanyakumari road (abandoned nh-7) dharmapuri town limit (sh-129) including upkeeping for a period of 60 months (01-cridp-19-20-i-4598) 3) improvements of bommidi r.s. - thoppaiyar road at km.18/2-19/4 and 20/0-20/6 and including dip raising at km.18/4, 18/6, 18/8, 20/4 and construction of culvert at 18/4, 18/6, 20/4 and reconstruction of culvert at km.18/8 (md-860) including upkeeping for a period of 60 months (01-cridp-19-20-m-1372) 4) improvements of bommidi r.s. - thoppaiyar road at km.21/0-22/4, including dip raising at km.21/4, 21/8, 21/10 & 22/2, construction of culvert at km.22/2 and reconstruction of culvert at km.21/4(i),(ii), 21/6(i),(ii), construction of retaining wall and curve improvements at km.21/2 & 21/4 (md-860) including upkeeping for a period of 60 months (01-cridp-19-20-m-1373) 5) widening from end to end and improvements of dharmapuri bus stand approach road at km.0/4-0/745 including construction of box culvert at km.0/8 and construction of drain at km.0/4-0/745 including upkeeping for a period of 60 months (01-cridp-19-20-o-2692) "
2468 Widening, Improvements, Improvements to Riding Quality to Government Roads Including Widening and Reconstruction of Culvert, Widening Pipe Culvert, Construction of Drain and up keeping the roads for a period of 60 months in Pappiredipatti (H) C&M Sub Division (Package 66 ) The Following works are involved in this package: The Following works are involved in this package 1. Widening from Two lane to Three lane and Improvements of Pappireddipatti - Mallapuram road at km 0/0 - 1/0 Reconstruction of culvert at km 0/10 (i) , 0/10(ii)(MD 328) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1357) 2. Widening from Two lane to Three lane and Improvements of Pappireddipatti - Mallapuram road at km 1/0 - 2/0 Widening of culvert at km 1/4 , 1/8 including Reconstruction of culvert at km 1/2(MD 328) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1358) 3. Widening from Two lane to Three lane and Improvements of Pappireddipatti - Mallapuram road at km 2/0 - 2/4 and 2/8 - 3/0 (MD 328) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1359) 4.Widening from Two lane to Three lane and Improvements of Pappireddipatti - Mallapuram road at km 3/0 - 4/0 including widening of pipe culvert and construction of Drain at km 3/8(MD 328) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1361) 5. Improvements to Riding Quality at km 2/6 - 4/6 of Boothanatham - Venkatasamuthiram road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4620) 6. Improvements to Riding Quality at km 4/6 - 6/0 of Boothanatham - Venkatasamuthiram road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4621) 7. Improvements to Riding Quality at km 6/0 - 7/6 of Boothanatham - Venkatasamuthiram road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4622)"
TRN : 718802 |  Salem - Tamil Nadu
Contract Value : 6.28 Crore | Agency Name : Highway Department
Tender award for widening, improvements, improvements to riding quality to government roads including widening and reconstruction of culvert, widening pipe culvert, construction of drain and up keeping the roads for a period of 60 months in pappiredipatti (h) c&m sub division (package 66 ) the following works are involved in this package: the following works are involved in this package 1. widening from two lane to three lane and improvements of pappireddipatti - mallapuram road at km 0/0 - 1/0 reconstruction of culvert at km 0/10 (i) , 0/10(ii)(md 328) including upkeeping for a period of 60 months (01-cridp-19-20-m-1357) 2. widening from two lane to three lane and improvements of pappireddipatti - mallapuram road at km 1/0 - 2/0 widening of culvert at km 1/4 , 1/8 including reconstruction of culvert at km 1/2(md 328) including upkeeping for a period of 60 months (01-cridp-19-20-m-1358) 3. widening from two lane to three lane and improvements of pappireddipatti - mallapuram road at km 2/0 - 2/4 and 2/8 - 3/0 (md 328) including upkeeping for a period of 60 months (01-cridp-19-20-m-1359) 4.widening from two lane to three lane and improvements of pappireddipatti - mallapuram road at km 3/0 - 4/0 including widening of pipe culvert and construction of drain at km 3/8(md 328) including upkeeping for a period of 60 months (01-cridp-19-20-m-1361) 5. improvements to riding quality at km 2/6 - 4/6 of boothanatham - venkatasamuthiram road including upkeeping for a period of 60 months (01-cridp-19-20-i-4620) 6. improvements to riding quality at km 4/6 - 6/0 of boothanatham - venkatasamuthiram road including upkeeping for a period of 60 months (01-cridp-19-20-i-4621) 7. improvements to riding quality at km 6/0 - 7/6 of boothanatham - venkatasamuthiram road including upkeeping for a period of 60 months (01-cridp-19-20-i-4622)"
2469 Widening, Improvements, Junction Improvements, Geomentrical Improvements, Improvements to Riding Quality to Government Roads including , Reconstruction of Box Culvert, Widening of Slab Culvert, Pipe Culvert, Construction of Well Protective Wall and up keeping the roads for a period of 60 months in Harur (H) C&M Sub Division (Package 61) The Following works are involved in this package 1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2689) 2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4611) 3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months(01-CRIDP-19-20-O-2707) 4.Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2712) 5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2713) 6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4633) 7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4634) 8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2703) "
TRN : 718796 |  Salem - Tamil Nadu
Contract Value : 6.02 Crore | Agency Name : Highway Department
Tender award for widening, improvements, junction improvements, geomentrical improvements, improvements to riding quality to government roads including , reconstruction of box culvert, widening of slab culvert, pipe culvert, construction of well protective wall and up keeping the roads for a period of 60 months in harur (h) c&m sub division (package 61) the following works are involved in this package 1. widening from single lane to intermediate lane and improvements of harur - kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, improvements at km 33/6 - 34/4 and including reconstruction of box culvert km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at km 33/6 and construction of well protective wall at km 29/4 including upkeeping for a period of 60 months (01-cridp-19-20-o-2689) 2. improvements to riding quality at km 0/0 - 2/950 of ammapet - thambal road including upkeeping for a period of 60 months (01-cridp-19-20-i-4611) 3. improvements of kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months(01-cridp-19-20-o-2707) 4.junction improvement at km 0/2 & 0/4 of sittlingli - s.thathampatii road to naikuthi (via) velanur road reconstruction of box culvert at km 0/2, 0/4 including upkeeping for a period of 60 months (01-cridp-19-20-o-2712) 5. junction improvement at km 2/4,3/6 of sittlingli- s.thathampatii road to naikuthi (via) velanur road including widening of pipe culvert at km 2/4 including upkeeping for a period of 60 months (01-cridp-19-20-o-2713) 6. improvements to riding quality at km 2/8 - 3/4 and 3/6 - 5/6 of sittlingli - s.thathampatii road to naikuthi (via) velanur road (using plastic waste) including upkeeping for a period of 60 months (01-cridp-19-20-i-4633) 7. improvements to riding quality at km 0/4 - 2/2 and 2/4 - 2/8 of sittlingli - s.thathampatii road to naikuthi (via) velanur road including upkeeping for a period of 60 months (01-cridp-19-20-i-4634) 8. widening from single lane to intermediate lane and improvements of andiyur - ammapet road at km 0/0 - 1/8 and geometrical improvements at km 0/6, 1/4 including widening of slab culvert at km 0/4 and reconstrction of box culvert at km 0/8, 1/6 including upkeeping for a period of 60 months (01-cridp-19-20-o-2703) "
2470 Improvements to Government Roads Including Construction of Retaining Wall, Reconstruction of RCC slab Culvert and up keeping the roads for a period of 60 months in Pennagaram (H) C&M Sub Division (Package 65) The Following works are involved in this package 1)Construction of Retaining wall at Km 42/8 (150m) & 42/10 (90m) of Omalur Mecheri - Pennagaram (Via) Perumbalai road (01- CRIDP - 19-20-S - 0464) 2)Construction of Retaining wall at Km 43/2 (140m), 43/4 (28m), 43/8 (30m) & 43/10 (135m) of Omalur Mecheri - Pennagaram (Via) Perumbalai road (01- CRIDP - 19-20-S - 0465) 3)Improvements of Pennagaram - Mudugampatti - Malaiyanur road at Km 22/8 - 24/040. (MD 859) including upkeeping for a period of 60 months. (01- CRIDP - 19-20-M-1378) 4)Reconstruction of RCC Slab Culvert at Km 12/10 of Pennagaram - Mudugampatti - Malaiyanur road.(MD 859) including upkeeping for a period of 60 months. (01- CRIDP - 19-20-M- 1380) 5)Construction of RCC Slab Culvert at Km 23/2 of Pennagaram - Mudugampatti - Malaiyanur road. (MDR 859) (01- CRIDP - 19-20-M-1399) 6)Construction of Retaining wall at Km 4/10 of Kombadiyur - Samathal road (01- CRIDP - 19-20-O-2721) 7) Construction of Retaining wall at Km 4/10 (65m) & 5/2 (30m) of Kombadiyur - Samathal road. including upkeeping for a period of 60 months. (01- CRIDP - 19-20-O-2720)"