You have searched for west-bengal in Awarded Tender Result. Click on any tender to view further details.

18521 Upgradation and development of existing B.P. Road to Concrete road from Gharami para more to Srinagar Khal and link road from Nityaranjan Halder's house to the house of Balaram Gharami in Mouja & G.P.-Surajnagar P.S.- Harwood point Coastral & Block- Kakdwip under Kakdwip-I Sub-Division. of C.E.D-II. Total length=(Main road-0.0m to 675.0+ Link road Ch 0.0 m to 110.0 m)= 785.00 m. (Plan Head)
18522 Upgradation and development of existing B.P. Road to Concrete road from NH-117 (Dholer Khal Bus stop) near Mahaprabhur Temple to Bazarberia High School in Mouja-Sitarampur & G.P.-Surajnagar P.S.- Harwood Point Coastral & Block- Kakdwip under Kakdwip-I Sub-Division. of C.E.D-II. Total length=(Main road-Ch 0.0 m to ch 1526.0m) = 1526.00 m. (Plan Head)
18523 Construction of B. P. Road from Ratikanta Das's house to River Embankment.Mouza : - Sapkhali.G. P. :- Muriganga - I.Block :- Sagar.P. S. :- Sagar. Under Sagar Sub-Division. Length :- Ch. 0.0 M. to 440.0 M. = 440.0 M.
18524 Upgrading & Development from B.P. road to Concrete road from House of Prasanta Roy towards Bhutumollar pole (NH-117) P.S.-Harwood Point Coastral Mouja-Sitarampur & Surajnagar in G.P.-Surajnagar & Block- Kakdwip under Kakdwip-I Sub-Divn. of CED-II“. (Ch. 0.00 m to 1580.0 m) (Length- 1580m) (PLAN)
18525 Upgrading & Development from B.P. road to Concrete road from Bhangir more towards Bhutumollar pole (Upto House of Prasanta Roy) P.S.-Harwood Point Coastral Mouja-Sitarampur & Surajnagar & Block- Kakdwip under Kakdwip-I Sub-Divn. of CED-II“. (Ch. 0.0 m to 1920.0 m) (Length- 1920m) (PLAN)
18526 Construction of Concrete road from the house of Bharat Das(near G.P. Office) to Ramgopalpur Digambar Market via the house of Panchanan Bera and the house of Manik Barik in G.P.-Ramgopalpur P.S. - Dholahat & Block- Kakdwip under Kakdwip-I Sub-Division. of C.E.D-II. ( Road No.I - 120.0m, Road No.II - 580.0m, Road No.III - 630.0m & Road No. IV - 115.0m) Total Length=1445.0m. (Plan Head)
18527 Construction of Concrete road from Balikhali Shashan near Jumai Naskar Hat to Gobindapur Sarper Pukur via Balikhali Agyan Para in Mouza - Srikrishana Nagar, G.P.-Netaji, P.S. - Dholahat & Block- Kakdwip under Kakdwip-I Sub-Division. of C.E.D-II. Length=1700.0m. (Plan Head)
18528 Upgradation and development of existing B.P. Road to Bituminous road from 13 no Chandipur Bazar (Starting from House of Gopal Das) to Bisalaxmitala Jetty ghat via jolermore in Mouja-Taktipur & G.P.-Bapugi P.S & Block- Kakdwip under Kakdwip-I Sub-Division. of C.E.D-II. Total length=(Main road-Ch. 0.0 m to ch. 3120.0m =3120.00 m. (Plan Head)
18529 Construction of New Wooden Bridge at Chakhori over Kamarnala Khal at Uttar Jhapordaha G.P, Block- Domjur under within erstwhile Juridiction of Trans Damodor Drainage Sub-Division of Lower Damodar Construction Sub Division No-IV under Lower Damodar Construction Division.
18530 Construction of Bituminous Road from Ghatihara Sluice gate via Sima Bundh Bus Stoppage to Bislaxmipur Bituminous Road near Amulya Samanta's house in Mouza-Gobindarampur,G.P.- Rishi Bankim Chandra, P.S. & Block- Kakdwip under Kakdwip-I Sub-Division of C.E.D-II. Total length = 2950.0 m. (Plan Head)

Get West Bengal Awarded Tender Alert...

933117

Advertisment
Advertisment