22011 Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 75.00 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for BEJPURA Water Supply Scheme at Harishchandrapur-II Dev. Block under Malda Division, PHE Dte. in the District of Malda
22012 Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 65.43 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for AKALPUR Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the District of Malda
22013 Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 67.48 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for RAMNAGAR Water Supply Scheme at Bamangola Dev. Block under Malda Division, PHE Dte. in the District of Malda
22014 Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 63.54 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for RANGHAIPUR Water Supply Scheme at Harischandrapur - I Dev. Block under Malda Division, PHE Dte. in the District of Malda.
22015 Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 49.14 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for ARJUNA Water Supply Scheme at Harishchandrapur-II Dev. Block under Malda Division, PHE Dte. in the District of Malda.
22016 Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 78.00 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for UTTAR KUMEDPUR Water Supply Scheme at Harishchandrapur-II Dev. Block under Malda Division, PHE Dte. in the District of Malda.
22017 Construction of a Culvert over Bahnir Beel on the road from Majhergram PBF Brick Field to Basudebpur Primary School within Nakasipara block in the District of Nadia.
22018 Sinking of Submersible with drinking water supply arrangement incld. Water tank connection etc complete at Amarargarh Kamalpur, Sansad-X under Bhalki GP
22019 SITC of UPS system at different place of Jangipur Sub Divisional Hospital in the district of Murshidabad.
TRN : 686751 |  Murshidabad - West Bengal
Contract Value : 6.93 Lacs | Agency Name : Public Works Department
Tender award for sitc of ups system at different place of jangipur sub divisional hospital in the district of murshidabad.
22020 Renovation works of Zonal Market Shopping Complex (Block -A , B and Fish Market )
TRN : 601858 |  Durgapur - West Bengal
Contract Value : 11.24 Lacs | Agency Name : Asansol Durgapur Development Authority
Tender award for renovation works of zonal market shopping complex (block -a , b and fish market )