You have searched for west-bengal in Awarded Tender Result. Click on any tender to view further details.

26031 Improvement of existing infrastruture with electricity,running and drinking water,toilet,mid-day meal shed,ACR,computer lab,common room,modular portable security cabin,cycle stand etc in 51 madrasahs in North 24 Parganas- Construction of Additional Class room , Computer Lab, Toilets and renovation of existing building at Bara Bankra Azizia High Madrasah [H.S.] - SL -06 [ 1st phase].
26032 Operation and Maintenance of entire AHP, ESP along with Coal Mill rejection operation for Unit 5 and 6 of STPS , WBPDCL.
TRN : 555589 |  Kolkata - West Bengal
Contract Value : 3.27 Crore | Agency Name : West Bengal Power Development Corporation Limited
Tender award for operation and maintenance of entire ahp, esp along with coal mill rejection operation for unit 5 and 6 of stps , wbpdcl.
26033 Annual rate Contract for Carriage of Coal reject boulder , that stacked during feeding bunker beneath conveyor gallery of CHP site, to different places under CHP(Oprn.) dept., STPS
26034 Consultancy Services for Construction Supervision for Widening and Strengthening of existing road corridor connecting Mogra on SH-13 in Hooghly District with Barajaguli on NH-34 in Nadia District via Triveni, Boropara, Kalyani and Kapa to 4/6 lane divided carriageway including Grade-separated corridor, ROB at Bansberia and six-lane Extra-dosed Cable-stayed Bridge over river Hooghly beside Iswar Gupta Setu at Kalyani in the State of West Bengal, India (Approximate length: 21 Km.) [PACKAGE-III]
26035 ESTIMATE FOR THE WATER SUPPLY SCHEME WITH RESERVIOR TANKS AT MIDDLE REACHES OF UPPER DALAPCHAN FROM D.K. JHORA AND GHIMIRAY JHORA UNDER KALIMPONG SUB-DIVISION & DISTRICT
26036 Construction of Dinning Cum Kitchen Shed at Brambhandiha Santali Model SchoolunderSarenga Development Block during the year 2018-2019
26037 Desigining , supplying , febrication, erection on suitable RCC foundation, commissioning with 3(three) months tiral run of pressure type Iron Elimination Plant of 65.34cum/hr. Capacity as per design norms of P.H.E. Dte. of Panchthupi Water Supply Scheme under Kandi Sub Division,P.H.Engg. Dte. In Murshidabad District
26038 Desigining , supplying , febrication, erection on suitable RCC foundation, commissioning with 3(three) months tiral run of pressure type Iron Elimination Plant of 65.34cum/hr. Capacity as per design norms of P.H.E. Dte. of Panchthupi Water Supply Scheme under Kandi Sub Division,P.H.Engg. Dte. In Murshidabad District
26039 Desigining , supplying , febrication, erection on suitable RCC foundation, commissioning with 3(three) months tiral run of pressure type Iron Elimination Plant of 65.34cum/hr. Capacity as per design norms of P.H.E. Dte. of Panchthupi Water Supply Scheme under Kandi Sub Division,P.H.Engg. Dte. In Murshidabad District
26040 Desigining , supplying , febrication, erection on suitable RCC foundation, commissioning with 3(three) months tiral run of pressure type Iron Elimination Plant of 65.34cum/hr. Capacity as per design norms of P.H.E. Dte. of Panchthupi Water Supply Scheme under Kandi Sub Division,P.H.Engg. Dte. In Murshidabad District

Get West Bengal Awarded Tender Alert...

162774

Advertisment
Advertisment